SolarPairing / Works, closed loop

KACO blueplanet hybrid 12.0 NH3 M3 × Dyness Tower Pro T19

KACO's April 2025 application note documents Dyness Tower Pro T19 with blueplanet hybrid 12.0 NH3 M3. The table lists 12 kW as the maximum available charge or discharge power for this combination and notes that the Dyness RJ45 assignment is identical to the KACO inverter assignment. Check the installed Tower Pro configuration and current manufacturer documents before commissioning.

Status

Works, closed loop

Last verified

2026-08-24

01 / About this pairing

KACO's April 2025 application note documents Dyness Tower Pro T19 with blueplanet hybrid 12.0 NH3 M3. The table lists 12 kW as the maximum available charge or discharge power for this combination and notes that the Dyness RJ45 assignment is identical to the KACO inverter assignment. Check the installed Tower Pro configuration and current manufacturer documents before commissioning.

02 / Source

https://kaco-newenergy.com/index.php?eID=dumpFile&t=f&f=19128&token=de506e606697f21baa83f74902ec344c35dca25d